SKIDS

Custody transfer – Oil refinery Novi Sad

End User: GAZPROM NEFT NIS ad

Scope of work: Delivery of material, fabrication and installation ( performed on site ) of 16 SKIDs for commercial measuring for incoming and outcoming luids
Equipment:

  • ISOIL
  • KHRONE

Date: 2008./2009.

Custody transfer – Oil refinery Pancevo

End Userr: GAZPROM NEFT NIS ad

Scope of work: Fabrication of SKIDs – 12 pcs – Delivery of material, installation work regarding electro-energetic and instrumentation, mechanical works.

Reconstruction of ship loading/unloading : On site installation of SKIDs – 12 pcs, delivery of material, installation work regarding electro-energetic and instrumentation, installation of the associated control system.

Equipment:

  • KHRONE
  • ISOIL
  • SMAR

Date: 2008./2009/2010

Railway transport – custody measurement – Oil refinery Pančevo

End User: GAZPROM NEFT NIS ad

Scope of work: Fabrication of SKIDs, 24 measurement SKIDs

Equipment:

  • EMERSON

Datr: 2010/2011

GILB ( Gasoline In-Line Blending ) – Oil refinery Pančevo

End User: GAZPROM NEFT NIS ad
Scope of work: Fabrication of 12 SKIDs, Blending set was made of 12 SKIDs.

Equipment:

  • EMERSON

Datet: 2013.

Oil refinery Novi Sad

End User: GAZPROM NEFT NIS ad

Scope of work: Fabrication of 18 SKIDs
Equipment: 

  • EMERSON

Date: 2013./2014.

LPG ( measurement of gas and liquid phase ), oil refinery Pancevo

End User: GAZPROM NEFT NIS ad

Scope of work: Fabrication of 24 SKIDs, SKID consists of gas and liquid phase, LPG railway loading
Equipment:

  • KHRONE
  • M+F Technologies

Date: 2012

Gas lift distributive system construction – Gas regulating and metering SKID – Kazakhstan

End User: ZHAIKMUNAI LLP

Scope of work: Delivery of material and fabrication of 3 packet units for gas measurement – Kazakhstan

Equipment:

  • AUMA
  • DANIEL
  • SCHIEBEL
  • WIKA
  • EMERSON
  • SIEMENS

Date: 2015

Modernization of oil fields and gathering stations (ASUTP) – SKIDs

End User: GAZPROM NEFT NIS ad

Scope of work: Fabrication and installation of 30 SKIDs

Equipment:

  • SIEMENS

Date: 2014

Truck loading system – EKO DUNAV

End User: GAZPROM NEFT NIS ad

Scope of work: Fabrication and installation of 3 SKIDs
Equipment:

  • EMERSON

Date: 2012

Laboratory for flow measurement, Oil refinery Pancevo

End User: GAZPROM NEFT NIS ad

Scope of work: Fabrication of SKID system with measuring line and installation work in laboratory
Equipment:

  • EMERSON
  • SIEMENS

Date: 2013-2014

Ship unloading

End User: Refinery Brod, Njeftgazinkorp, Republic of Srpska

Scope of work: Fabrication and installation of 1 SKID
Equipment:

  • EMERSON

Date: 2011

Railway and truck loading

End User: Refinery Modrica, Republic of Srpska

Scope of work: 9 SKIDs project design, SKID fabrication and installation
Equipment:

  • FOXBORO

Date: 2012