Substations and switchgears

Power substation 20/0.4 kV 2×1000 kVA – I phase

End User: BEOHEMIJA – INHEM d.o.o. Zrenjanin

Scope of work: Delivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Date: 1999.

Power substation 20/0.4 kV 2×1000 kVA – II phase

End Userr: BEOHEMIJA – INHEM d.o.o. Zrenjanin

Scope of work: Delivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Date: 2008./2009

Power substationreconstruction; Power substation 2×1000 kVA 20/0.4kV, Filter compensation, High voltageline 20kV

End User: FAM Sečanj d.o.o.

Scope of work: Delivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up, development of as-build project.

Datr: 2005./2006./2007.

Power Substation 20/0.4 kV 1×1000 kVA

End User: Factory ofouldand plant grease „SUNCE“ Sombor.
Scope of work: Delivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Datet: 2006.

Power Substation 1000 kVA 20/10/0.4 kV

End User: TEGUM d.o.o.

Scope of work: Delivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Date: 1997./1998.

Power substation 1×1000 kVA, 20/10/0.4 kV

End User: PACCOR Serbia d.o.o.

Scope of work: Delivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Date: 2013.

„FSH 100%“ Velika Plana Power substation 1×1000 kVA, 10/0.4 kV

End User: INSOFT automatic d.o.o.

Scope of work: Delivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Date: 2011.

Power substation 1000 kVA, 10/0.4 kV

End User: INSOFT automatic d.o.o.

Scope of work: Delivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Date: 2009./2010.

Power substation “CMANA” 1000 kVA, 20/10/0,4 kV

End User: INSOFT automatic d.o.o.

Scope of work: Delivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Date: 2013.

Power substation 1000 kVA 20/10/.04 kV

End User: „Production MILE DRAGIĆ”

Scope of work: Power substation 1000 kVA 20/10/.04 kDelivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-upV.

Date: 2001.

Power substation 1×1000 kVA 20/10/0.4 kV

End User: LIVNICA Kikinda automobilska industrija d.o.o.

Scope of work: Delivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Date: 2005.

Power substation 1×1000 kVA 20/10/0.4 kV

End User: LIVNICA Kikinda automobilska industrija d.o.o.

Scope of work: Delivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Date: 2006.

Power substation SAFE Plus 6

End User: LIVNICA Kikinda automobilska industrija d.o.o.

Scope of work:Delivery and installation of: high –voltage block, electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Date: 2007.

Power substation 2 x 630kVA

End User: TEGUM d.o.o.

Scope of work: Revision of power substation.

Date: 1997.-2004.

Power substation 2x630kVA

End User: GEZE d.o.o. Zrenjanin

Scope of work:Delivery and installation of: electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Date: 2009./2010./2011.

Power substation 630kVA 20/0,4kV

End User: ZZ “BRATSTVO I JEDINSTVO”

Scope of work: Delivery and installation of: electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up.

Date: 2010./2011.

Power substation 250kVA 20/10/0,4 kV

End User: KIKINDSKI MLIN a.d. Kikinda

Scope of work: Delivery and installation of: electrical transformer, low-voltage block, laying and connection of cables, commissioning and start-up, repair the the consequences of accident.

Date: 2011.

TS6 6.3/0.4kV 1000 kVA

End User: Fabrika šećera “TE&TO” Senta

Scope of work: TS-6 6.3/0.4 kV 1000 kVA – installation, testingand start-up.

Date: 2011.