Installation, commissioning and start-up

Tank Farm

End User: Victoria Group -Šid

Scope of work: Installation of measuring-control equipment, cable laying and wiring, commissioning, start-up, as-build project and test run. Owner of technology: Lurgi AG
Equipment:

  • DCS:  Yokogawa
  • Field equipment : E&H, Yokogawa

Date: 2007

The system of automatic control and monitoring of technological processes (ASUTP)

End Userr: GAZPROM NEFT NIS ad

Scope of work: Electrical and instrumentation works regarding the adaptation of the measuriement-control installation for oil wells (176 pcs) turn-key.

Equipment:

  • TREI
  • GEOSTAR
  • MOXA
  • Bullet Ubiquiti / Wavion WBS-2400

Date: 20010./20011

Truck loading system – Oil refinery Pančevo

End User: GAZPROM NEFT NIS ad

Scope of work: Mechanical, electrical and instrumentation work as a part of the work on reconstruction and modernization of truck loading system in the Oil refinery Pančevo.

Equipment:

  • EMERSON

Date: 2012

Hydrogen unit (HGU) – Oil refinery Pančevo

End User: GAZPROM NEFT NIS ad
Scope of work: Construction of  hydrogen block in the Oil refinery Pančevo – Electrical and instrumentation work

Equipment:

  • YOKOGAWA

Date: 2012.

CO2 separation from natural gas, Amine Unit – Gas refinery Elemir

End User: GAZPROM NEFT NIS ad

Scope of work:

Delivery of material, electrical and instrumentation works on Project „CO2 separation from natural gas“  in Gas refinery Elemir

  • Delivery and installation of cables, cable trays
  • Heat trace – delivery of material and installation
  • Installation of field equipment and wiring in DCS cabinet
  • MCC
  • Configuration of field devices ( flow, level, pressure, temperature measurement )
  • Commissioning, loop check
  • Participation in start-up

Equipment: 

  • EMERSON

Date: 2013./2014./2015.

Measurement of vibration on rotating equipment II phase

End User: GAZPROM NEFT NIS ad

Scope of work: Delivery of installation of material, electrical and instrumentation work – project “Installation of vibration measurement system on the rotating equipment”
Equipment:

  • BENTLY NEVADA

Date: 2014

Hydrocracking, Oil refinery Pancevo

End User: GAZPROM NEFT NIS ad

Scope of work: General installations, grounding, Equipotential system

Equipment:

  • OBO BETTERMAN
  • SCHNEIDER ELECTRIC
  • ZUMTOBEL

Date: 2011./2012.

Railway transport – custody measurement – Oil refinery Pančevo

End User: GAZPROM NEFT NIS ad

Scope of work:

  • Delivery of installation material, electrical, instrumentation and mechanical works on the repair of process and measurement installations, fabrication and installation of 24 measurement SKIDs, installation of the associated control system.
  • Delivery of material and works on mechanical, measurement-control and electro-energetic equipment within the recontruction and modernization of “Krak A,B and C”
  • As-build project
  • Commissioning, Start-up, Trial run

Equipment:

  • EMERSON

Date: 2010./2011.

GILB –Gasoline InLine Blending

End User: GAZPROM NEFT NIS ad

Scope of work:

  • Delivery of installation material, local control stations, junction boxes,
  • Installation of measuring-control equipment, DCS cabinet
  • Configuration of field equipment
  • Installation of analyser house, along with appropriate pipelines, valves,…
  • Commissioning
  • Testing
  • Start-up

Equipment:

  • EMERSON
  • SIEMENS

Date: 2015./2016.

Gas stations – Janosik, Velika Gred

End User: NIS – Srbijagas

Scope of work: Fabrication of SKID system with measuring line and installation work in laboratory
Equipment:

  • YOKOGAWA – transmitters
  • ELSTER
  • ABB – Gas Chromatograph

Date: 2014./2015.